Quick Reference
Menu map, demo-data codes and statuses
Menu Map
| Group | Models |
|---|---|
| Plans & Command | Emergency Plan, Emergency Procedure, Command Structure, Command Role Assignment, Emergency Control Location, Plan Review |
| Scenarios & Controls | Emergency Scenario, Scenario Control, Scenario Plan Link |
| Contacts & Notification | Emergency Contact, Notification Template |
| Resources & Readiness | Emergency Resource, Resource Scenario Link, Resource Inspection, Readiness Assessment, Readiness Assessment Item |
| Competency & Roles | Competency, Emergency Role Competency, Person Competency |
| Exercise Program | Emergency Exercise, Exercise Objective, Exercise Hazard Assessment, Exercise Participant, Exercise Location |
| Exercise Conduct | Exercise Inject, Exercise Event Log, Exercise Communication, Exercise Muster, Muster Person, Simulated Casualty, Resource Deployment |
| Evaluation & Improvement | Exercise Observation, Exercise Debrief, Exercise Finding, Corrective Action, Exercise Report |
| Requirements & Documents | Source Authority, Source Document, Requirement, Plan Requirement Link, Document |
| Reference & Administration | Organisation, Mine Site, Operating Area, Person, Position, Person Position |
Key Codes in the Demo Data
The demo runs one site — Demonstration Mine (DEMO_MINE), open cut, Queensland, remote — across three exercises at three different points in their lifecycle.
| Code | What it is |
|---|---|
DEMO_MINE |
The site. Areas SITE, PIT-N, PROCESS, WORKSHOP, ADMIN, MUSTER-A, MUSTER-B |
SC-FIRE-01 |
Processing plant fire with smoke exposure — LEVEL_3, 45 people, 10-minute response target |
SC-FLOOD-01 |
Extreme rainfall and site access loss — LEVEL_3, 120 people, external impact possible |
SC-MEQ-01 |
Mobile equipment collision with multiple casualties — LEVEL_3, 8-minute response target |
EMP-DEMO-001 Rev A |
Site emergency plan, SUPERSEDED — the version the 2025 exercise tested |
EMP-DEMO-001 Rev B |
Site emergency plan, ACTIVE — adds the written command handover format (section 4.7) that Rev A lacked |
EMP-DEMO-002/003/004 |
Evacuation & muster (ACTIVE), mass casualty & medical (UNDER_REVIEW), wet season contingency (ACTIVE) |
ECC-01 / ECC-02 / FWD-01 |
Emergency Control Centre, alternate ECC (READY_WITH_LIMITATION — no plant mimic), North Pit forward control point |
EX-DEMO-2025-0007 |
The completed one. Mass Casualty Mobile Equipment Field Simulation, 12 Nov 2025. Fully conducted — 6 injects, 15 event-log entries, 6 communications, muster, 3 casualties, 6 resource deployments, 9 observations, 2 debriefs, 6 findings, 2 report revisions. Status ACTIONS_OPEN |
EX-DEMO-2026-0001 |
The upcoming one. Processing Plant Fire Functional Exercise, 19 Aug 2026 — the proforma pack's exercise verbatim. Status PLANNING, hazard assessment still DRAFT, injects PLANNED |
EX-DEMO-2026-0002 |
The no-notice one. North Pit muster drill, 24 Jun 2026. Reconciled in 11 minutes, no missing persons. Status CLOSED |
EXF-2025-00031 |
CRITICAL — a simulated casualty was moved and tracked without a triage tag; unaccounted for on the board for 11 minutes |
EXF-2025-00032 |
MAJOR — command handover with no record and no announcement → drove Revision B of the plan |
EXF-2025-00036 |
MAJOR — stale on-site list produced two false missing persons → fixed, then proven fixed by the June 2026 drill |
ECA-2026-00011 |
The one action still AWAITING_VERIFICATION — the call-out roster. This is why EX-DEMO-2025-0007 is not CLOSED |
ECA-2026-00020 |
OVERDUE — the muster kit inspection, due 16 June 2026 |
ERA-2026-0001 |
Annual readiness assessment, READY_WITH_LIMITATION. Rates mass-casualty triage NOT_TESTED — the honest gap |
ERI-2026-00046 |
The satellite terminal that failed to register on 6 July → single-string comms into the wet season |
MED-TRAILER / MUSTER-KIT |
READY_WITH_LIMITATION (expiring stock) and INSPECTION_OVERDUE (lapsed June) |
RS08 / WA-EM-GL |
Recognised Standard 08 (2021, ACTIVE — with the 2017 version held as SUPERSEDED) and the WA guideline, status REVIEW because the source itself is under review |
Status Vocabularies (the important ones)
Plan lifecycle: DRAFT → UNDER_REVIEW → APPROVED → ACTIVE, then
SUSPENDED, SUPERSEDED, ARCHIVED
Exercise lifecycle: PROPOSED → PLANNING → APPROVED → SCHEDULED →
IN_PROGRESS → COMPLETED → DEBRIEFING → REPORT_REVIEW → ACTIONS_OPEN → CLOSED;
plus PAUSED, ABORTED, CANCELLED
Readiness status (resources, control locations, scenario controls,
assessments): READY · READY_WITH_LIMITATION · NOT_READY · OUT_OF_SERVICE ·
UNKNOWN · INSPECTION_OVERDUE
Rating (objectives, observations, readiness items): EFFECTIVE ·
PARTLY_EFFECTIVE · INEFFECTIVE · NOT_TESTED · NOT_OBSERVED
Finding classification: COMMENDABLE_CONFORMANCE · OBSERVATION ·
IMPROVEMENT_MINOR · NONCONFORMANCE_MAJOR · NONCONFORMANCE_CRITICAL
Action status (findings and corrective actions): OPEN · ASSIGNED ·
IN_PROGRESS · BLOCKED · AWAITING_VERIFICATION · VERIFIED · CLOSED · CANCELLED ·
OVERDUE
Inject status: PLANNED · RELEASED · ACKNOWLEDGED · ACTED_ON · SKIPPED ·
CANCELLED — the demo's media inject is SKIPPED, deliberately, to protect the
extraction and triage objectives when the exercise ran late
Muster status (per person): EXPECTED · ACCOUNTED_FOR · MISSING · OFFSITE ·
EXEMPT · UNKNOWN
Casualty status: SIMULATED · LOCATED · TRIAGED · TREATED · EXTRACTED ·
TRANSFERRED · DECEASED_SCENARIO · CLOSED
Competency status: CURRENT · EXPIRING · EXPIRED · SUSPENDED ·
NOT_VERIFIED
Emergency level: ALERT · LEVEL_1 · LOCAL · LEVEL_2 · SITE · LEVEL_3 ·
EXTERNAL_SUPPORT · LEVEL_4 · MAJOR_DISASTER (kept as the proforma pack
authored them — see the DSL header)
Rules of Thumb
- An exercise does not start without an approved hazard assessment carrying
stop criteria and a real-emergency protocol, and does not reach
CLOSEDwhile any major or critical action is unverified. - Injects are released only while the exercise is
IN_PROGRESS; a released inject recordsactual_release_at, its acknowledgement and its outcome. - Anything real that happens during an exercise window goes in the same event
log with
real_event = true. Never in a separate book. - A critical resource must be
READYor formally limited —NOT_READYon a critical resource is an escalation, not a status update. - Action closure is verified by somebody other than the owner. The demo's verifications are all cross-person by design.
- A competency expiring within 30 days is a warning, not a formality: the demo drops below the required three current incident-command holders on 20 August 2026, and there is an open action about it.
- Contacts are verified on a 90-day cycle. Two in the demo are outside it, and that is visible on the contact list rather than hidden.